Coal Mine Regulation CMR (11-36) MCQ
So this post is Regulation Number 11 to 36 MCQ and explanations of Coal Mine Regulation 2017, in this, we have included all the important mining MCQ related to this and tried to explain them along with all the MCQs.
|
coal-mine-regulation-part-3
|
1. Who is the Chairman of the Mining Examination Board?
खनन परीक्षा बोर्ड के अध्यक्ष कौन हैं?
a) C.I.
b) R.I.
c) Central Govt. Officer
d) Manager with 2 years of experience
Answer - A
2. How many members are in the Mining Examination Board?
खनन परीक्षा बोर्ड में कितने सदस्य होते हैं?
a) 5
b) 6
c) 7
d) 8
Answer - B
3. What is the working period of the members of the Mining Examination Board?
खनन परीक्षा बोर्ड के सदस्यों की कार्य अवधि कितनी होती है?
a) 2 year
b) 3 year
c) 4 year
d) 5 year
Answer - B
4. Whom can the board members resign?
बोर्ड के सदस्य किससे इस्तीफा दे सकते हैं?
a) R.I.
b) C.I.
c) Central Govt. Officer
d) Manager with 2 years of experience
Answer - B
5. minimum board members required for a board meeting?
कम से कम कितने सदस्यों मे बोर्ड बैठक होती है?
Answer - A
6. Which certificate cannot be restricted to opencast only?
कौन सा प्रमाण पत्र केवल ओपनकास्ट तक सीमित नहीं हो सकता है?
a) Overman
b) Gas testing
c) Surveyor
d) Mining sirdar
Answer - B
7. What is the minimum age to sit for any mining exam?
किसी भी खनन परीक्षा में बैठने के लिए न्यूनतम आयु क्या है?
a) 18 year
b) 20 year
c) 23 year
d) 21 year
Answer - B
Learn Easily With Video↓↓↓
8. How much experience is required to obtain a Mining Sardar's Certificate from Diploma?
डिप्लोमा से खनन सरदार का प्रमाणपत्र प्राप्त करने के लिए कितना अनुभव आवश्यक है?
a) 1
b) 2
c) 3
d) 4
Answer - A
9. How much experience is required to obtain a Mining Sardar's Certificate without diploma?
बिना डिप्लोमा से खनन सरदार का प्रमाणपत्र प्राप्त करने के लिए कितना अनुभव आवश्यक है?
Answer - C
10. How much experience is required to obtain engine driver certificate?
इंजिन ड्राईवर का प्रमाणपत्र प्राप्त करने के लिए कितना अनुभव आवश्यक है?
a) 1
b) 2
c) 3
d) 4
Answer - A
11. Maximum age limit for Manager in mines?
मैनेजर की पोस्ट के लिए उच्चतम आयु कितनी होती है ?
a) 55 year
b) 60 year
c) 65 year
d) 70 year
Answer - D
12. What is the minimum qualification required to become an chief Inspector in the mine?
खदान में चीफ इंस्पेक्टर बनने की लिए न्यूनतम योग्यता कितनी होनी चाहिए?
a) Engineer degree
b) 1st Class Manager certificate
c) Both
d) Diploma
Answer - C
13. What is the minimum age to become a manager?
मैनेजर बनने के लिए न्यूनतम आयु कितनी होती है?
a) 18 year
b) 20 year
c) 23 year
d) 25 year
Answer - C
14. If the production of an underground mine is more than 2500 tonnes per month, so the manager shoud be?
यदि किसी भूमिगत खदान का उत्पादन 2500 टन प्रति माह से अधिक है तो, मैनेजर होना चाहिए?
a) 1st Class Manager certificate
b) 1st or 2nd Class Manager certificate
c) overman certificate holder
d) anyone can
Answer - A
15. If the production of an Opencast mine is more than 20000 cubic meter tonnes per month, so the manager should be?
यदि किसी ओपनकास्ट खदान का उत्पादन 20000 m3 प्रति माह से अधिक है तो, मैनेजर होना चाहिए?
a) 1st Class Manager certificate
b) 1st or 2nd Class Manager certificate
c) overman certificate holder
d) anyone can
Answer - A
16. Whose permission is required to hire a person with less qualification than manager?
मैनेजर से कम योग्यता वाले अधिकारी को मैनेजर रखने के लिए किसकी परमिशन लेनी पढ़ती है?
a) C.I.
b) R.I.
c) Central Govt. Officer
d) Manager with 2 years of experience
Answer - A
17. How many days before, the manager should have to inform to leave his post?
मैनेजर को अपना पद छोड़ने से, कितने दिन पहले सूचना देना पड़ता है?
a) 7 days
b) 14 days
c) 15 days
d) 30 days
Answer - D
18. How many kilometers within the mine boundary is there a provision for the residence of the manager?
मैनेजर और Assistant मैनेजर को खान की सीमा के कितने किलोमीटर के अंदर निवास देने का प्रावधान है?
a) 2 km.
b) 3 km.
c) 4 km.
d) 5 km.
Answer - D
19. Safety officer appointed in the mine when production occurs?
सेफटि ऑफिसर नियुक्त किया जाता है?
a) UG ( 2500 T/M) OC (10000 m3/M)
b) UG ( 5000 T/M) OC (20000 m3/M)
c) UG ( 7500 T/M) OC (30000 m3/M)
d) UG ( 15000 T/M) OC (50000 m3/M)
Answer - B
20. How low the production in the first degree mine, We can merge safety officer and ventilation officer work?
कितने से कम उत्पादन वाली प्रथम डिग्री खदान में सुरक्षा अधिकारी और वेंटीलेशन अधिकारी का पद की एक किया जा सकता है?
a) 5000 T/M
b) 10000 T/M
c) 15000 T/M
d) 20000 T/M
Answer - C
21. Electric engineer appointed in the mine when?
इलैक्ट्रिक इंजीनियर नियुक्त किया जाता है?
a) Over 650 Vault Power Used
b) 1.5 MVA Installing Electric Equipment
c) Both
d) Over 11000 Vault Power Used
Answer - C
22. Mechanical engineer appointed in the mine when?
मेकैनिकल इंजीनियर नियुक्त किया जाता है?
a) 1000 HP
b) 1500 HP
c) 500 HP
d) There is no provision
Answer - B
23. If an engineer wants to work in 2 mines, Then he has to take permission?
किसी इंजीनियर को 2 खदान में कार्य करने के लिए किससे परमिशन लेनी पड़ती है?
a) Regional Inspector
b) Chief Inspector
c) Both
d) There is no provision
Answer - B
Mining के सभी update के लिए Click करें
post कैसी लगी आप नीचे comment कर के बता सकते हैं । आपकी प्रतिकृया से हमे इस website को और बेहतर बनाने का प्रोत्साहन मिलेगा ।
mining videos के लिए आप हमारे youtube channel में जा सकते हैं ।
आप एक उत्तम श्रेणी के पाठक के जो सभी जानकारीयों को अंत तक पढ़ते है, आपकी यह खूबी आपको भविष्य में बहुत सहायता प्रदान करेगी ।
Thankyou For Connecting With Us...
Give me a pdf
ReplyDeletepart 3 coal mine regulation (11-36) pdf link
Deletehttps://drive.google.com/file/d/1cf1C4NbcVQzhJ5aV8Z9Kp5M0SQEXtW02/view?usp=sharing
as922283@gmail.com
ReplyDeleteplz send me in pdf
thanks.
as922283@gmail.com
ReplyDeleteplz send me in pdf
thanks.
Nice job sir ji
ReplyDeleteanandaniket13537@gmail.com is my mail id....
ReplyDeleteUr questions will be really helpful to us.... plz send me
part 3 coal mine regulation
Deletehttp://clickyfly.com/jmc4Y
harinandan1392@gmail.com
ReplyDeletepart 3 coal mine regulation
Deletehttp://clickyfly.com/jmc4Y
barikbiswajit933@gmail.com
ReplyDeletepart 3 coal mine regulation
Deletehttp://clickyfly.com/jmc4Y
rohit.khurana7777@gmail.com
ReplyDeleterohit.khurana7777@gmail.com
ReplyDeleterohit.khurana7777@gmail.com
ReplyDeleteGive me the part 3 pdf.. i have alot tym send u my email address u not send me the pdf.. can u plz send me the pdf..
part 3 coal mine regulation (11-36) pdf link
Deletehttps://drive.google.com/file/d/1cf1C4NbcVQzhJ5aV8Z9Kp5M0SQEXtW02/view?usp=sharing
Sir please provide all the pdf file below the YouTube video it's very easy for all the students 🙏🙏🙏
ReplyDeletepart 3 coal mine regulation (11-36) pdf link
Deletehttps://drive.google.com/file/d/1cf1C4NbcVQzhJ5aV8Z9Kp5M0SQEXtW02/view?usp=sharing
I want pdf
ReplyDeleteI want pdf
ReplyDeletepart 3 coal mine regulation (11-36) pdf link
ReplyDeletehttps://drive.google.com/file/d/1cf1C4NbcVQzhJ5aV8Z9Kp5M0SQEXtW02/view?usp=sharing
I want pdf sumitpaswanwashery@gmail.com
ReplyDeletepart 3 coal mine regulation
Deletehttp://clickyfly.com/jmc4Y
beingawasthi55@gmail.com
ReplyDeletepart 3 coal mine regulation
Deletehttp://clickyfly.com/jmc4Y
मुझे PDF दीजिये सर
DeleteGive me link reg part 1
ReplyDeleteMujhe pdf dijiye sir
ReplyDeleteBahut usefull video banaye hai sir
ReplyDeleteमुझे PDF भेज दीजिये सर
ReplyDeleteबहुत usefull video है सर जी
ReplyDeletevishwajitbediya.98@gmail.com
ReplyDeleterjranjeetnag1997@gmail.com
ReplyDeletePdf
ReplyDeletePrinceajay184@gmail.com
ReplyDeleteCmr all pdf MCQ
ReplyDeleteI want pdf
ReplyDeleteI want pdf
ReplyDeleteI wany pdf
ReplyDeletetalam0052@gmail.com
ReplyDeletenavedahmed810@gmail.com
ReplyDeletenavedahmed810@gmail.com
ReplyDeleteQ.15, rong answer
ReplyDeleteAns- 1st and 2 nd class manager (20000 to 50000)m³
Above 50000m³/month(1st manager )
harvanshrai78@gmail.com