Part 5 - Coal Mine Regulation 64 to 75

coal-mine-regulation-2017-mcq-64-75


In this post, we cover MCQ-related regulation no.

64. General requirements about mine plans 
65. Type of plans 
66. Plans and sections to be submitted after abandonment, closure, or discontinuance 
67. Survey instruments and materials 
68. List of plans, sections, and instruments and their storage 
69. Preparation of plans by surveyors 
70. Plans to be checked on change of ownership or on reopening, etc 
71. Outlets from a mine 
72. Working shafts 
73. Fencings and gates at outlets 
74. Outlets from mine parts 
75. Periodic examination of shaft, incline, and other outlets. 


All important regulations MCQs are covered.


Coal Mine Regulation 64 to 75


 1.  Which items are not mentioned in the mine map?

खदान के नक्शे में किन चीजों का उल्लेख नहीं होता?

a) mine name
b) owner name
c) the purpose of the map
d) Overmen name

Answer - D


 2.  Normally on what scale are the mine's maps drawn, unless provided ?
सामान्यता खदान के नक्शे कितने पैमाने पर बनाए जाते हैं, जब तक उपबंधित न किया जाए, ?

a) 1000: 1
b) 2000: 1
c) 5000: 1
d) A or B

Answer - D


 3.  When is a vertical plan prepared?

 वर्टिकल प्लान कब बनाया जाता है?

a) Average slope more than 15 °
b) Average slope more than 30 °
c) Average slope more than 45 °
d) Average slope more than 50 °

Answer - B


 4.  If a workplace does not have two exit routes, who allows the employment of individuals?

यदि किसी कार्यस्थल में दो निकास मार्ग नहीं है तो, व्यक्तियों की नियोजन की अनुमति कौन देता है ?

a) C.I.
b) R.I.
c) Manager
d) Owner

Answer - A

 5.  Which plan is made if the distance between the 2 seam is less than 9 meters?

यदि दो सीम की आपस में दूरी 9 मीटर से कम हो तो कौन सा प्लान बनाया जाता है ?

a) key plan
b) joint survey plan
c) combined plan
d) geological plan

Answer - C

Learn Easily With Video↓↓↓



 6.  Who can order to map different types of scale?

अलग प्रकार के पैमाने पर नक्शा बनाने का आदेश कौन दे सकता है?

a) R.I.
b) C.I.
c) Manager
d) Owner

Answer - B


 7.   On which of the following things the mine's map is not made?

माइंस का नक्शा इनमें से किस चीज पर नहीं बनाया जाता है?

a) Durable paper
b) Tracing cloth
c) Polyesters film
d) Regular paper

Answer - D


 8.  Full form of CHP?

CHP का full form क्या है ?

a) Coal Handling Plan
b) Coal Handle Plant
c) Coal Handling Plant
d) Coal Health Plan

Answer - C

 9.  What is the regulation no 9 ?

Regulation no. 9 क्या है ?


a) Notice of accident
b) Notice of disease
c) Board of Mining Examination
d) Notice of reopening

Answer - B


 10.  When a joint survey plan prepared?

ज्वाइंट सर्वे प्लान कब बनाया जाता है?

a) Working within 60 meters of adjacent mine boundary
b) To show the extent of the mine
c) When the mine is filled with water
d) all

Answer - D


 11.  Full form of MGR?

MGR का full form क्या है ?

a) Marry Go Round
b) Move Go Round
c) Marry Gone Round
d) None of these

Answer - A


 12.  Which of the following does not have to be in the underground map of the mine?

खदान के भूमिगत नक्शे में इनमें से क्या होना आवश्यक नहीं होता है?

a) Incline
b) Cross measure drift
c) pumping station
d) colony

Answer - D

 13.  A mechnical device is used in a mine shaft, when shaft is deeper than ?

कितने मीटर से अधिक गहरे साफ्ट पर आने जाने की व्यवस्था यांत्रिक साधन से की जाती है ?


a) 100 meter
b) 50 meter
c) 30 meter
d) In every shaft

Answer - C

 14.  Which of the following is not shown in a mine map?

एक नक्शे में इनमें से क्या नहीं होता है ?


a) True north
b) Magnetic meridian
c) plan purpose
d) Workers management

Answer - D


 15.  Full form of ISO in mining?

mining में ISO का full form क्या होता है?


a) International security Organisation
b) Internal security Organisation
c) Internal Safety Organisation
d) International Safety Organisation

Answer - C


 16.  What is the regulation no 17?

a) Practical experience of candidates for Surveyor’s Certificate examination
b) Practical experience of candidates for Engine driver's Certificate examination.-
c) Practical experience of candidates for Manager’s Certificate examination.-
d) Practical experience of candidate for Sirdar’s Certificate examination

Answer - D


 17.  At least how much centimeters long scale is permissible for mine's plan?

कम से कम कितना लंबा उपयुक्त प्रकार से विभाजित किया वह स्केल पैमाना माननीय होता है?


a) 15cm
b) 25cm
c) 35cm
d) 45cm

Answer - B

 18.  Two mines or incline of each mine should be controlled by?

प्रत्येक खदान के दोनों शाफ़्ट या incline किसके कंट्रोल में होना चाहिए?


a) C.I.
b) R.I.
c) Manager
d) Owner

Answer - C


 19.  Minimum number of shafts, inclines or other outlets to surface is necessary from any belowground working?

प्रत्येक खदान से सरफेस में बाहर आने के लिए कम से कम कितने शाफ़्ट या Incline रास्ते होना चाहिए?

a) 1 
b) 2
c) 3
d) 4

Answer - B


 20.  What is the distance of incline when man riding system is applied?

Incline की दूरी कितने होने पर man riding system लगाया जाता है?

a) 500 meter
b) 1000 meter
c) 100 meter
d) 30 meter

Answer - B


 21.  Full form of OEM ?


a) Original Equipment Manufacturer
b) Older Equipment Manufacturer
c) Online Equipment Manufacturer
d) Original Equipment Machine

Answer - A


 22.  There is a provision to revise the map by how many months?

नक्शे को कितने महीने पीछे तक संशोधित करने का प्रावधान है?


a) 3 months
b) 6 months
c) 9 months
d) 12 months

Answer - A

 23.  What is the regulation no 19 ?

रेग्युलेशन नो 19 क्या है?

a) Fees for grant of Certificates
b) Practical experience of candidates for Engine driver's Certificate examination
c) Number of attempts at examination
d) Practical experience of candidate for Sirdar’s Certificate examination

Answer - C


 24.  Every shaft, incline and other outlet provided shall be examined, once at least in every?

प्रत्येक शाफ्ट, इंकलाइन व अन्य निकास मार्गों की जांच कितने दिनों में एक बार की जाती है?

a) Every day
b) 7 days
c) 14 days
d) 30 days

Answer - B


 25.  Which plan is made for the leased land?

लीज़ ली गई जमीन के लिए कौन सा प्लान बनाया जाता है?

a) key plan
b) joint survey plan
c) combined plan
d) geological plan

Answer - D

 26.  What should be the length and width of the underground passage connecting the two shafts, inclines or outlets.

दो शाफ्ट, इंक्लाइन या आउटलेट को जोड़ने वाले भूमिगत मार्ग की लंबाई और चौड़ाई क्या होनी चाहिए?


a) 1.8 meters hight and 1.5 meters wide
b) 1.8 meters hight and 1.2 meters wide
c) 2.4 meters hight and 1.8 meters wide
d) None of these

Answer - A

 27.  Every mechanised outlet shall be examined at least once in every seven days by ?

प्रत्येक यांत्रिक्रत निकास मार्ग की जांच प्रत्येक 7 दिन में इनमे से कौन करता है ?


a) Engineer
b) Electrical supervisor or foreman
c) Competent person authorised by the engineer
d) All of the above

Answer - D


 28.  Full form of RCC ?

RCC का full form क्या है?


a) Reinforced Concrete Cement
b) Reinforced Cement construction
c) Reinforced Cement Concrete
d) Rein  Cement Concrete

Answer - C


 29.  What is the regulation no 40 ?

रेग्युलेशन no. 40 क्या है?

a) Duties and responsibilities of owner
b) Responsibilities of contractor
c) Duties of person employed in mines
d) Duties of officials

Answer - C


30.  In any shaft, ladders are used as a means of ingress or egress of persons in a mine, inclination of not more than ___ degrees from the horizontal ?

सॉफ्ट में लगाई जाने वाली सीढ़ी का ढाल कितना अधिक नहीं होना चाहिए?

a) 45 degree
b) 60 degree
c) 80 degree
d) 90 degree

Answer - C

 31.  A map shows a correct position with which of the following?

एक नक्शा इनमें से किस के साथ एक सही स्थिति दिखाता है?


a) Survey of India national grid
b) Reserve station 
c) Mine Magazine
d) Manager's office

Answer - A


 32.  Which plan is made if it is not possible to show the leased land in a map?

यदि लीज ली गई जमीन को एक नक्शे में दिखाना संभव न हो तो कौन सा प्लान बनाया जाता है?

a) Key plan
b) Joint survey plan
c) Combined plan
d) Geological plan

Answer - A


 33.  What is the regulation no. 65 ?

कोयला रेगुलेशन नंबर 65 क्या है?


a) Duties and responsibilities of shotfirer
b) General requirements about mine plans
c) Type of plans
d) Outlets from a mine

Answer - C


 34.  Such shafts, inclines or outlets shall not be less than____ meters distant from one another at any point?

 साफ्ट, निकास मार्ग या इंक्लाइंड एक दूसरे से कितनी पास नहीं होना चाहिए?

a) 10 meter
b) 12.5 meter
c) 13.5 meter
d) 16.5 meter

Answer - C

 35.  Within how many days the mines plan are submitted if the mine work is postponed for more than 60 days?

खदान का कार्य  60 दिन से अधिक स्थगित किए  जाने पर कितने दिनों के अंदर नक्शे जमा किए जाते हैं?

a) 30 days
b) 60 days
c) 90 days
d) 120 days

Answer - C


 36.  If the soft ladder is long, then after how far the platform is given?

यदि सॉफ्ट की सीढ़ी लंबी हो तो, कितनी दूरी के पश्चात प्लेटफार्म दिया जाता है?

a) 3 meter
b) 9 meter
c) 12 meter
d) 15 meter

Answer - B


 37.  Who gives permission, when there is no exit route from each underground places?

खान के प्रत्येक भाग से बाहर जाने वाले रास्ते न होने पर छूट कौन देता है?

a) R.I.
b) C.I.
c) Manager
d) Owner

Answer - B


 38.  Within how many days the mines plan are submitted if the mine work is abandoned or closed? 

खदान का कार्य abandoned या बंद हो जाने पर कितने दिनों के अंदर नक्शे जमा किए जाते हैं?

a) 30 days
b) 60 days
c) 90 days
d) 120 days

Answer - A


 39.  If there is a ladder in a shaft, there is a provision to keep it out on the surface to height?

यदि किसी सॉफ्ट में सीढ़ी लगी हुई है तो, सरफेस पर कितनी ऊंचाई तक बाहर रखने का प्रावधान है?

a) 1 meter
b) 2 meter
c) 3 meter
d) 4 meter

Answer - A

 40.  खान मे कोई दुर्घटना होने पर सूचना दी जाती है ?

a) चीफ़ इंस्पेक्टर 
b) रीजनल इंस्पेक्टर 
c) जिला मजिस्ट्रेट 
d) सभी 


Answer - D

 41.  Every sinking shaft provided with a permanent lining of metal, concrete or masonry, not be more than ____ meters from the bottom of the shaft?

यदि किसी सिंकिंग शाफ़्ट में परमानेंट लाइनिंग धातु, कोंकरीट या गांथनी की हो तो, शाफ्ट की तल्ली कितने मीटर से अधिक नहीं होगी ?

a) 3 meter
b) 6 meter
c) 9 meter
d) 20 meter

Answer - B


 42.  गजट में विनिर्देशित रोग होने पर कितने समय के अंदर सूचना दी जाती है ?

a) 7 दिन 
b) 14 दिन 
c) 21 दिन 
d) 3 दिन 

Answer - D

 43.  Which certificate cannot be restricted to opencast only?

कौन सा प्रमाण पत्र केवल ओपनकास्ट तक सीमित नहीं हो सकता है?

a) Overman
b) Gas testing
c) Surveyor
d) Mining sirdar

Answer - B


 44.  Every sinking shaft provided with a permanent lining of iron or steel rings with a substantial lagging, not be more than ____ meters from the bottom of the shaft?

यदि किसी सिंकिंग शाफ़्ट में परमानेंट लाइनिंग लोहे व स्टील की रिंग व मजबूत लैगिंग से कांथी को सपोर्ट किया जाता है , शाफ्ट की तल्ली कितने मीटर से अधिक नहीं होगी ?

a) 3 meter
b) 6 meter
c) 9 meter
d) 20 meter

Answer - D

 45.  How much experience is required to obtain a Mining Sardar's Certificate from Diploma?

डिप्लोमा से खनन सरदार का प्रमाणपत्र प्राप्त करने के लिए कितना अनुभव आवश्यक है?

a) 1
b) 2
c) 3
d) 4

Answer - A


 46.  What is the minimum age to become a manager?

मैनेजर बनने के लिए न्यूनतम आयु कितनी होती है?

a) 18 year
b) 20 year
c) 23 year
d) 25 year

Answer - C


 47.  If an engineer wants to work in 2 mines, Then he has to take permission?

किसी इंजीनियर को 2 खदान में कार्य करने के लिए किससे परमिशन लेनी पड़ती है?

a) Regional Inspector
b) Chief Inspector
c) Both
d) There is no provision

Answer - B


 48.  Who has the duty to arrange 2 exits from each underground workplace?

प्रत्येक भूमिगत कार्यस्थल से 2 निकास मार्गों की व्यवस्था करना किसका कर्तव्य है ?

a) Mining sirdar 
b) Overman 
c) Owner 
d) Under manager

Answer - C


 49.  In how many days in a week, manager would inspect the workplace?

मैनेजर प्रत्येक सप्ताह में कितने दिन कार्यस्थलों की जांच करेगा?

a) 2 दिन 
b) 3 दिन 
c) 4 दिन 
d) प्रत्येक दिन 

Answer - C


 50.  In how many days the efficiency of mechanical fans is inspected?

यांत्रिक पंखे की दक्षता कितने दिनो में एक बार ज्ञात की जाती है ?


a) 7 दिन 
b) 30 दिन 
c) 3 महीने 
d) 1 साल 

Answer - C

 51.  Incline क्या होती है?


a) Gallery road ways 
b) surface से भूमिगत भाग में जाने वाला ढालू रास्ता
c) Transporting line 
d) ALL

Answer - B

Mining के सभी update के लिए Click करें 


 Download PDF ↓↓↓ 

part-5-coal-mine-regulation-pdf-link

post कैसी लगी आप नीचे comment कर के बता सकते हैं । आपकी प्रतिकृया से हमे इस website को और बेहतर बनाने का प्रोत्साहन मिलेगा । 

mining videos के लिए आप हमारे youtube channel में जा सकते हैं । 

Youtube    -  Click Here 

Facebook  -  Click Here

इन्हे भी अवश्य देखें 



आप एक उत्तम श्रेणी के पाठक के जो सभी जानकारियों को अंत तक पढ़ते है, आपकी यह खूबी आपको भविष्य में बहुत सहायता प्रदान करेगी । 

Thankyou For Connecting With Us...



97 Comments

Please do not enter any spam in the comment box

  1. I want pdf of all videos of cmr 2017

    ReplyDelete
    Replies
    1. https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  2. Replies
    1. part 5 pdf link

      https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  3. My email id is anandaniket13537@gmail.com


    The questions will be really helpful for our preperation... Plz mail me the PDF to the above mentioned mail-id.

    ReplyDelete
    Replies
    1. part 5 pdf link

      https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  4. Replies
    1. part 5 pdf link

      https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  5. Replies
    1. https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  6. Replies
    1. https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  7. Replies
    1. https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  8. Replies
    1. part 5 pdf link

      https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  9. Replies
    1. part 5 pdf link

      https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  10. Replies
    1. part 5 pdf link

      https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  11. Replies
    1. part 5 pdf link

      https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  12. Replies
    1. part 5 coal mine regulation pdf link

      https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      part 2 coal mine regulation pdf link

      https://drive.google.com/file/d/1S-58cPfUzrNjxtYar5ilF1-AgyXUPYNH/view?usp=sharing

      Delete
  13. faiyazansari827@gmail.com

    Please provide all regulation pdf
    Thank you sir

    ReplyDelete
    Replies
    1. All PDFs have a seperate link, if you want to download a pdf then the link under all posts will be provided soon.

      part 5 coal mine regulation pdf link
      https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharing

      Delete
  14. part 5 coal mine regulation pdf link
    https://drive.google.com/file/d/17B3uM3_vfRHS6ohfeBbhbCUochtF2JlF/view?usp=sharin

    ReplyDelete
  15. part 5 pdf link
    http://clickyfly.com/tCNnM

    ReplyDelete
  16. Sir mujhe sabhi part ka pdf chahiye

    ReplyDelete
  17. i want mcqs pdf mines act 1952,mines rules 1955,cmr 2017,mmr 2019

    ReplyDelete
  18. bpbrijeshpatel099@gmail.com

    ReplyDelete
  19. All reg pdf. santoshsonip4@gmail.com

    ReplyDelete
  20. snehashivam89@gmail.com

    ReplyDelete
  21. chandanpanda.2k@gmail.com


    Chapter 5,6 and 10

    ReplyDelete
  22. Good morning sir
    Thank you sir providing this video please 🙏 send pdf..

    ReplyDelete
  23. dinbandhu9631@gmail.com

    ReplyDelete
  24. dinbandhu9631@gmail.com

    ReplyDelete
  25. rajputsatyam5101997@gmail.com

    ReplyDelete
  26. vivekthakur0657@gmail.com
    Please provide pdf it would be very helpful🙏

    ReplyDelete
  27. ak6799480@gmail.com

    ReplyDelete

Post a Comment

Please do not enter any spam in the comment box

Previous Post Next Post